Behind the idyllic image of a well-maintained football pitch or golf course lies an industry built on experience, innovation and craftsmanship. One of the leaders in this field is Hendriks Graszoden, an established name in Europe. In 2025, the ambitious company celebrates its 50th anniversary, meaning every project is backed by half a century of expertise and passion!

Erik Hendriks, managing director, explains: “As a trusted supplier to both FIFA and UEFA, we provide advice from leading experts. Our aim is to create natural grass pitches for our clients, from World Cup stadiums to league and non-league grounds. Hendriks Sport Development also specialises in the design and maintenance of these sports pitches. With our vast experience, we have a solution for every challenge!”

UEFA standards set the benchmark for quality soil

Erik Hendriks: “To start with, we build the growing medium for our turf here ourselves. We use our own ‘mother’ soil, combined with imported sand, which has to meet a wide range of requirements. It must fully comply with the standards set by UEFA and followed by Hendriks Graszoden. The standards, which both we and the football club must meet to the letter, mainly concern water infiltration. In short, the granular composition of the turf is identical to that of the local subsoil. This avoids creating an impermeable layer that could hold water.” The DIN 18035 standard is the guiding principle for natural and hybrid pitches, covering the aggregate, mineralisation and grass composition.”

A logistical masterpiece

“We can also replace an entire football pitch in a stadium within 24 hours,” Erik continues. “That means removing the existing turf and laying the new one. To do that, we have built a truly enormous logistical operation. Naturally, you want the turf on the roll as quickly as possible, by which I mean the time from harvesting to laying.” “Once a project gets under way, a lorry arrives here roughly every half hour to collect turf. We can harvest the turf and fully load the lorry in just 20 minutes. The same process takes place at the stadium, of course, but in reverse. Over the past 20 years, we have completely optimised that ‘conveyor belt’, from harvesting to laying the turf. This includes everything from perfectly levelling the ground and using the laying machines to finishing the turf seams. Afterwards, the entire pitch is cleaned, checked for any ‘mistakes’ and rolled.”

From K’NEX to bespoke precision machines

“Of course, none of this would be possible without being 100% optimised. We therefore have a large number of machines that we have developed ourselves. For example, we are the only company in the world with a harvesting machine that can cut rolls 2.40 metres wide. That is exactly twice the standard width on the market. Each roll therefore covers 36 m2 of grass: 2.40 x 15 metres! At the time, the harvesting machine was literally designed by us, the four Hendriks brothers, using K’NEX. On that basis, we bought an agricultural machine, of which only the steel frame remained, and even that was modified. Once we had that machine, we developed the laying machine. And so on …”

“In short, our machines enable us to lay and finish a whole pitch of around 8,000 m2 within 12 hours. And because our rolls are much longer and wider than the market standard, you end up with 70% fewer seams than usual. That helps create a safe playing surface for top footballers,” concludes Erik Hendriks.  

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeKeeping turf strong and playable
  • SubjectConstruction
Share this article

Follow on Keep it Green

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.